If you are using SAP HANA 1.0 with below SPS version from 10, then SPS12 upgrade is mandatory before start the SAP HANA 2. Recommendation is first upgrade to SPS12 and continue with SAP HANA 2.0 upgrade Customers on SAP HANA 1.0 with SPS10 can upgrade directly to SAP HANA 2.0 There will not be any new SPS release for HANA 1.0, so last version of the SPS for HANA 1.0 is SPS12Īccording to this picture, planned new SPS release dates are like below įor the HANA 2.0 implementation on “EHP8″ for SAP ERP 6.0 (SAP Note : 2447796)įollowing picture can be using yo transition path to “SAP HANA 2.0″ The new ArcGIS Enterprise Geodatabase for HANA First Impressions to set up and configure SAP HANA as an ArcGIS. Last SPS will have “5 years long maintenance period” for HANA 2.0 Maintenance duration for new SPS (Software Package Stack) will be “2 years” from starting with SPS02 for HANA 2.0 There will be “1 SPS per year” for HANA 2.0 End of maintenance extended to “May 2021″ for the version of HANA 1.0 SPS12 Firstly, you need to enter the essential data required to create a cost estimate. To explain this, I have put some relevant SAP Screen images below. Its creation in S4 HANA Finance involves some steps with the use of certain transaction codes (Tcodes). There are several terms used to describe parts of the SAP HANA release strategy.Also HANA 1.0 and HANA 2.0 have big differences according to SAP HANA release strategy documentations and snotes which i am going to try to explain in this article.īelow picture will show you the main situation about current HANA 1.0 SPS12 and the new version of HANA 2.0 Material Cost with quantity structure is an important part of the Standard Cost Estimate in SAP.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |